SOLAR PERMIT DESIGN + VanT AI

Solar Permit Design & PE Stamping Coordination for US EPCs

VANTAGE CAD helps Solar Installers, EPC Contractors, Engineering Firms and Solar Developers streamline project design, permitting and documentation workflows across the USA, with NEC-based plan sets typically delivered in 8–12 hours.

40+ US statesEngineer-reviewed3-tier QA audit
0+Solar permit sets delivered
0+US states covered
8–12 hrTypical permit-set turnaround
0-tierQA audit on every project
Our Solar Engineering Services

Everything your project needs to get permitted

From the first site plan to the final as-built, one partner covers design, engineering support and permit corrections for residential and commercial solar.

Residential & Commercial Permit Plan Sets

Complete, code-compliant plan sets built for fast AHJ approval.

Electrical & Structural Engineering Support

Calculations and attachment detail aligned with your mounting system.

PE Review & Stamping Coordination

Licensed Professional Engineer review and stamp coordination for your jurisdiction.

Solar PV Single-Line Diagrams

Clear SLDs backed by system calculations for permit review.

Battery Storage, Hybrid & Off-Grid Design

ESS, hybrid and off-grid systems with storage-specific code checks.

NEC-Based Design & AHJ Permit Corrections

Designs built to the NEC, with fast fixes for AHJ comments.

From site data to permit set

Hours, not days

  1. 1

    Share site inputs

    Send site survey inputs and project details.

  2. 2

    Design & engineering

    Engineers prepare plan sets, SLDs and structural analysis to local code.

  3. 3

    3-tier QA audit

    Every project is audited three times before delivery.

  4. 4

    Permit-ready delivery

    Packaged for authority review, typically within 8–12 hours.

Hi, I’m VanT!
VanT AI plan check: free of cost

Introducing VanT AI: smarter solar permitting

Our VanT AI technology initiative brings artificial intelligence into solar engineering and permitting, checking drawings against AHJ, utility and code rules before they reach the authority. Engineers keep the final call.

  • AI-assisted NEC, IFC and IRC compliance analysis
  • Solar permit requirement identification
  • Automated single-line diagram (SLD) generation
  • Intelligent technical document analysis
  • Streamlined solar engineering workflows

Seven verdicts, nothing silently passed:

MetLikely metPartialNot foundConflictManual reviewNot applicable
Why choose VANTAGE CAD?

Engineering support without expanding your team

Whether you are an independent solar installer, a growing EPC or an established engineering firm, we help you increase design capacity, reduce documentation workload and keep projects moving.

Experience-driven engineering and CAD support

Coverage across 40+ US states

Typical permit-set turnaround of 8–12 hours, depending on project scope

Quality-controlled technical documentation

Flexible outsourced design capacity for growing EPCs

Engineering support without expanding your in-house team

ONE PARTNER. COMPLETE SOLAR DESIGN SUPPORT. SMARTER PERMITTING.

Ready to get your next permit set moving?

Send your site inputs and receive a scoped quote. Typical permit-set turnaround is 8–12 hours, depending on project scope.

Request a Quote →
VanT AIFREE